Customs and Border Protection Patrol Roads

Customs and Border Protection Patrol road
SIZE:

20 miles

Client:

U.S. Army Corps of Engineers Fort Worth District

This border protection project includes 20 miles of new patrol roads in four locations along the U.S. southern border, providing access to remote areas.

Halff prepared final design-build RFP documents and conducted topographic surveys, alignment studies, and hydrologic and hydraulic (H&H) analysis for this project.

Halff Services
Involved

  • Federal

Let’s Connect

Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.

Contact Us