Mount Dora Eastern Service Area WTP

Mount Dora water treatment plant
  • Two 16” Floridan aquifer wells
  • Two 2,000 gpm potable water well pumps
  • 1,000,000-gallon ground storage tank with cascade tray aerator
  • Three VFD-controlled high service pumps with a capacity of 2,000 gpm each
  • Electrical and controls
  • 700 kW diesel-powered emergency generator and transfer switch
  • Liquid pre- and post-chlorination facilities
  • Iron sequestration feed system
  • High service pump building equipped with photovoltaic solar cells

Let’s Connect

Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.

Contact Us
I'm Interested in
How did you hear about us?